Friday 23 December 2016

All change on The Bark

Renovations continue
December 2016

Whilst there have been no boat movements in recent weeks, there has been no shortage of work on the boats, preparing them for next year which will be on us in no time.

To start with Wand'ring Bark there is a whole pile of work left over from last spring. Our few outings of 2016 revealed a major flaw in the redesign of the saloon. The key issue was the creation of the L shaped settee. This new settee offers loads more space but it became apparent that we both like to sit with our legs up and as it was me who was left uncomfortable, a further refinement was needed. 

The extended settee (awaiting cushion)

After a bit of thought I removed the old stereo cupboard (which was pretty well redundant) and replaced it with an oak table level with the seat. This seems to work well and an additional cushion has been ordered from Elite Furnishing. This configuration has the added benefit of making the settee into a nice long single bed, which increases our hospitality options.

Linked to the new settee I have also made a set of shelves to go on the other side of the cabin, under the gunnel. This proved to be a bit more challenging than I anticipated because it needs to support a laptop without projecting too far into the room. Lots of ideas were considered and in the end a section of the top was made to flip out, extending the flat space to about 32cm.

Shelf with flap

Another new feature of the galley is the inclusion of a 32 litre 12 volt freezer which sits under the settee. This unit has been in place for a year but has never been run due to and absence of wiring and also an insufficient supply of electricity.

Shelves fixed but without power socket

But this is all about to change. Last week I took the plunge and installed the power supply cables which reach back to the bus bar in the electrical cabinet. It just needs wiring in.

This links onto the power supply issue. Whilst  the engine has always provided the power we need whist travelling, our prolonged stops will soon reveal its shortcomings. The only sensible answer is to go solar. After much research two 160 watt panels plus an MTTP controller were purchased from Midsumer. These big boys toys are currently cluttering up our store room, but will soon be fitted and plugged into yet another power cable which I ran alongside the one for the freezer. What the sun giveth, the freezer will certainly take away!

The next project is to create a tiltable cradle for the panels on the roof and the purchase of a new, larger battery bank - but thats for another day!

1 comment:

Ade said...

Nice work Andy, always enjoy reading your blog.
Hope Helen is well or getting that way.
Merry Christmas & a Happy New Year to you Both.
Cheers
Ade