Wednesday, 21 April 2010

Barbidge to Anderton

Barbridge to Anderton
Easter 2010 part 4
Monday 5th April

20 miles - 8 locks - 8 hours

The weather has reverted to winter, with a relentlessly cold westerly wind which has spun round from a low in the north. The good news is that the day has remained  rain free - just endless leaden sky.

Canal house at Barbridge Junction

After four days afloat it's time to replenish the water tank which was accomplished at the junction. The junction house is for sale which is a lovely three story classic with water on two sides and a marina behind. A canal buff's paradise.

Our attempts at watching a DVD last night was marred by an overheating inverter, which had to be reset every 10 seconds. It was a one hour DVD so I will leave you to work out how many times we had to intervene. The old inverter was only a little 150 watt unit to charge mobile phones so powering a laptop was a challenge too far. I therefore desided to bite the bullet and buy a replacement with a bit more oomph (thats technical speak for an enhanced power output capacity). I stuck with Sterling and bought a 350 watt unit from Venetian Marina who supplied a good quantity of advice along with the product. Once fitted into the 12 volt supply it was a 100% success and well worth the £68 investment.

House at Church Minshull

The Middlewich Branch of the Shropshire Union Canal is not a favourite of many boaters, but with its lofty perch above the River Weaver it does offer some spectacular views to the north. We  came across another very fine canalside property in Church Minshull, where tree felling had provided a hitherto unseen view of it's fine flemish gables. Its not for sale but I would certainly hanker for such a location.

River Weaver Aqueduct

The aqueduct over the  River Weaver justified a stop and a scramble down a very steep embankment. This effort was rewarded by the sight of an impressive main span with smaller flood relief channels either side.

I am normally a placid kind of guy but I did get a bit hot under the collar when a boat, seeing us approaching, pulled out into out path and stole the locks as they dawdled right through Middlewich, left the bottom gate open and wandered off into town. 

Wreck in Flash

We pushed on into that curious area of the flashes,  patches of open water caused by subsidence into brine extraction sites. I am particularly taken by Billinge Green Flash with it's moulderng old hulks and then the next one with its seemingly 'placed' stern section which crumbles a little bit more with each passing year. One of these days we will pass by and it will be gone forever.

Brunner Mond chemical works

Brunner Mond Chemical works may not be beautiful but they do offer a bit of industrial contrast after four days of relentless rurality, great gouts of steam hissing and spitting from leaky valves. This industrial complex leads to Wolverton Boatyard with its trademark boat lift made out of  converted container crane, to the best of my knowledge a unique structure.

Wolverton boat crane

Finally it was into Anderton and a mooring just before the lift, ready to try and catch the first lift down in the morning. Peversley, if you book you have to pay to the clever money says "turn up and hope for the best - and save the fee" we will see.

Tuesday, 20 April 2010

Audlem to Barbridge

Audlem to Barbridge
Easter 2010 - Part 3
Sunday 4th April

10 miles - 6 locks - 4 hours

Easter morning and a visit to St John the Great for Easter Communion. The parish church offered a really warm welcome and the lady Vicar worked out immediately that we were "off the boats". Maybe it was the slightly down at heel clothes! What a lovely way to celebrate the day of the Lord's resurection - he is risen indeed. Belle and Tilly drove over in time for church armed with Easter Eggs, a roast chicken and sundry supplies we had overlooked.

St John the Great Audlem

After church we wents to take a look at Audlem Mill Craft Centre where a month long canal art exhibition was underway. Paintings are a very personal thing and it's not often I find an artist whose style is entirely to my taste. I was therefore delighted to discover Sheila Webster, a local artist whose translucent and misty style is quite beautiful, but the paintings come at a price so I will have to save up my pennies. There I was enthusing about the paintings not realising that the artist was standing behind me - its a good job I was being complimentary.

Belle bought a clippy mat kit to go round the fire on WB, another homely addition to look forward to.

Shed at Audlem bottom lock
The four of us set off and made steady progress to Barbridge. With is being a pleasant bank holiday Sunday there were boats a plenty, but the stong  winds played havoc with the less experienced helmsmen. At times nearly every boat seemed to me trying  to pole themselves off the lee bank. Just north of Audlem another new marina hs opened, as yet occupied by a handful of boats. With all these new berths, and so few new boats being built one has to wonder where the customers will come from.

Audlem marina

Just before Hurleston Junction we saw Silver Kroner, all decked out in her Sweedish blue and yellow. This craft was featured recently on Canal Boat and its key innovation is a huge retractable glass roof. The price for this multi layered glass assembly is a big lump at the back of the boat. Whatever the benefit inside, the damage this does to the aesthetics of the craft was a price too high in my view.

Hack Green stables

We had a splended roast meal at Barbridge before Belle and Tilly were wisked back to Audlem by taxi, leaving Jeff and I to our own devices once more.

Babridge sunset

Monday, 19 April 2010

Norbury Junction to Audlem

Norbury Junction to Audlem
Easter 2010 part 2

3rd April 2010

17 Miles - 21 Locks - 8 Hours

We awoke to find sun streaming in, accompanied by soft spring air which was such a contrast to the arctic  conditions of yesterday.

Shroppie Fly at Audlem

We set off into Grub St cutting, which was somehow reduced in grandeur with the trees devoid of their leaves and the edges of the cutting very visible against the morning sky. The recent rains had saturated the surrounding land and all the drains were pouring torrents of muddy water into the canal at every opportunity, and causing every overflow weir to foam with surplus water. The by washes at Tyrely were similarly awash and playing merry hell with boats moving upstream. However the raw edge of winter seems to have given way to spring.

Audlem Locks

As we passed through the Adderley flight a boat waithing to ascend suddenly slewed across he cut shouting that he had lost power. One look down the engine hatch revealed that far from  snapping a throttle cable, the problem was more fundemental, and more serious. The prop shaft coupling had sheared off letting the engine settle 2 inches out of true. Good job the owner belonged to RCR, who were on the scene within the hour.

NB Dane

We passed a wooden working pair on the Audlem Flight, a live aboard butty being bow hauled, followed by the Motor Boat "Dane", and old FMC tanker by the looks of it. The poor chap was working both locks, bow hauling the butty and then dashing back on his bike to move the motor - no wonder he looked knackered.

Audlem Stables

We rattled down the first 11 of the Audlem flight, stopping at the visitor moorings between locks 11 and 12, near the Bridge Inn. I tried the dongle for the first time and discovered a problem on the credit front - bother!

Audlem Visitor Moorings
Belle and Tilly will be joining us tomorrow for the Easter Service at Audlem Parish Church and then on to Barbridge catching a taxi back to recover her car. Lets hope the good weather holds for another day.

Sunday, 18 April 2010

Calf Heath to Norbury Junction

Calf Heath to Norbury Junction
Easter 2010 - Part 1
2nd April 2010
A change of plan

Night one finds us at Norbury Junction, not an obvious choice of route from Calf Heath to the River Trent I hear you cry.

Our plans to travel down the Trent to the Chesterfield Canal were always subject to the vagaries of the weather and the one thing we didn't want was a sucession of rain bearing low pressure systems to sweep the area the week before we set off. Murphy's Law being what it is delivered rain by the bucket full the week before Easter, with many of the rivers going into flood.

Boat with character on the Shroppie

I was caught on the Trent in flood two years ago and am not in any hurry to repeat the experience. It's a mercurial and tempremental navigational route and when the water level rises is can quickly become both frightening and dangerous. We therefore took an eleventh hour raincheck and opted to a safer canal based route for Easter instead.

Our plan B is a route up the Shropshire Union, across to the Trent and Mersey and then spend a few days on the Weaver Navigation befoure moving on to Manchester and then home via the Peak Forest and the Macclesfield - basically the combined Four Counties and Cheshire Rings.

The forecast for day one (Good Friday) was grim but as often happens, it turned out better than expected and what rain there was fell whilst we were moored.

Turner's new landing stage

We passed a small group from Wolverhampton Boat Club below Wheaton Aston Lock, opposite the newly refurbished landing stage.

NB Chertsey

Stretton Boatyard was it's usual busy self, rammed full of interesting craft in varying states of repair. The one that caught my eye was the backside of Chertsey, freshly blacked and covered in sheeting where the engine was removed. I was surprised by the relaively diminutive size of her propeller - I has expected someting larger if that isn't too rude a thing to say about such a venerable old lady (the boat - not Sarah!). 

NB Debdale was out and about as well, but without Adam or his trademark hat.

Jeff - crew or cabin boy.

We (Jeff and I) had planned a night at Gnosall, but with the sun making a surprise appearance we pressed on to Norbury, mooring just beyond the bridge and very near NB Starcross. All in all a good day with the weather much kinder than expected.   

Saturday, 17 April 2010

Toll End Communication Canal Update - BCN

Toll End Communication Canal Update - BCN
Cycling expedition
Update April 2010, Original post 25th October 2009

Update
Whilst there were quire a few structures to see at the eastern end of the Toll End Communication Canal, there was much less to see at the top end as it approached the New Main Line at Caggy's Boatyard.
I was therefore rather pleased to find a 1970's photo of both Lock No2 and Moat Farm Bridge which sat immediately to the east of the railway.

Moat Farm Bridge over lock 5 on the Toll End Communication Canal

Elliot Street Branch 1960 (BCLM/Black Country Canals) 



Just before in filling in 1977 (Black Country Society / Black Country Canals)


 Lock beyond Caggys Yard - lock 4

Original Post
My search for obscure waterways draws me back to the Tipton area time and time again.

This is not because the area has any particular scenic beauty, far from it. In fact, much of it can best described as a post industrial wasteland, but nowhere else in the UK contains so many canals in such a small area. Of course, many of these waterways were abandoned in the middle of the last century but the desolate nature of the area means that, with a bit of poking around, telltale remains are still visible on the ground.


Tipton Green Branch Canal, middle lock chamber

The Toll End Communication Canal is a waterway with a confusing history, a hybrid never really knowing what it was. Soon after Brindley completed what we now refer to as the Old Main Line, a short 1/4 mile branch was dug to the east of Tipton Green in 1805, dropping down through three locks, known as the Tipton Green Branch. This initially terminated somewhere near the line of today's New Main Line at Watery Lane Junction. There is not a lot to see of this canal today, save the chamber of the middle lock which has been incorporated into a path.


The same scene as above in 1957

The following year the Tipton Green Branch was extended for a further mile, descending through four locks and following the line of what is now an open land drain to the side of Tipton Cemetry.

Toll End Branch Canal entrance from the Walsall Canal


Starting at the other end, a side arm of the Broadwaters Canal (now the Walsall Canal) was built in 1801, rising up through two locks to reach a new coal mine. Eight  years later, in 1809, the Toll End Branch was extended westwards, linking into the mid point of the Tipton Green Branch, with the addition of two more locks. There is little to see of the Toll End section today, apart from a raised water pipe spanning an infilled entrance, and a bricked up archway under Toll End Road.

Rebuilt Brookhouse bridge

Further west the canal path can be detected passing under Bridge Road before it is completely lost under industrial wasteland, but continued on up the hill next to Tipton Cemetry, kinking round to the right to join the mid point of the older Tipton Green Branch. The line of this sharp twist  is  still visible from the air in the form of a stand of trees (just above Thursfield Road on the map).

Toll End Communication Canal bed from Bridge Road Tipton

The area between the eastern end of the Tipton Green Branch and the western end of the Toll End Branch became home to the Horsley Ironworks until 1865, which supplied many of the fine canal bridges we see in the area today.The recent construction of a new road to replace the old railway level crossing has revealed an archway in the embankment behind Caggy's yard, which was probably the canal bridge. Sadly, the construction team were not enthusiastic about my request for a hands on investigation, hence no photo!

The construction of the New Main Line in 1829 cut through the Tipton Green Branch creating  Watery Lane Junction, which is now the site of Caggy's Boatyard.

So, this short 1 3/4 mile canal with its 9 locks was built in four stages over eight years to service the local mines and industry, until it was abandoned in 1966 and filled in in the 1970's.