Saturday, 23 October 2010

Bufferies Basin Arm, Bumblehole

Bufferies Basin Arm
Bumblehole, BCN
23 October 2010

If I were Jimmy Saville I would be going "aye aye pop pickers, I'll take five points from you for this one" and waggle my cigar between my ring encrusted fingers. This is obscurity built on obscurity.


The junction basin containing a new folly

 
 Bufferies Basin junction

The far end of the Bumblehole Turn contained a further half mile arm heading north and leading out of what is now the winding hole. The name is obscure but the best I can offer is The Bufferies Basin but it was so long it really represented an arm in its own right .

The state of play in 1902 - with the top end already infilled

The plan had been to build it right up to Baptistend but in the event it  progressed a few hundred metres beyond a feeder stream before petering out in a wide basin linked by tramways to the nearby collieries.

Canal channel

Feeder stream from Baptistend

Today very little remains of the line, a hump in the road at the junction, a linear depression in the parkland and finally a valley in which the terminus was located, a site abandoned even in 1902.

Bufferies Basin Terminus

This hunt was to gain an idea of the old line without any expectation of tangible remains. The best clue to it's location is the feeder stream which continues to flow in its old course before being fed into a duct which defines the line and level of the canal. This is the one firm location on the entire line. 

Possibly one best appreciated by the die hard fanatics among us!

Friday, 22 October 2010

Bumblehole Turn

Bumblehole Turn
BCN
22 October 2010

Of all the place names on the BCN Bumblehole is one if the most curious. I have absolutely no idea of its origins and it needs to be remembered that until the straight route to the Netherton was built this was just another loop on the Dudley No2 Canal. Maybe it was trying to make up for the utilitarian name it used to live under.

 Bumblehole Arm

This half mile stub is very much in water and is home to half a dozen narrowboats, all safely tucked in behind a swinging yellow boom. The line used to be very overgrown but this has since been opened out and there is no reason why a dedicated arm bagger should not go in, pass the boom and wind in the entrance of the old Bufferies Basin arm.


Bumblehole moorings

The arm curls round a pond in a little valley - presumably Bumble Hole itself and maybe an old opencast mine or clay pit? After the by pass was built the canal remained to serve the substantial Windmill Boiler Works on the collapsed section, and the Washington Boiler and Girder Works which are now occupied by the builder of eclectic structures like the "windmill" folly.
Bumblehole winding hole - with scrap folly

Thursday, 21 October 2010

Boshboil Arm, BCN

Boshboil Arm
Netherton
21 October 2010

I'm not sure if this section is really lost or not. A short sunken section certainly qualifies.

Entrance to Boshboil Arm

It forms part of the Bumblehole loop which was short cutted by an embanked section built as part if the Netherton Tunnel project. The loop remained in water till the far end subsided into pit workings thereby leaving two distinct arms.

OS Map 1901
 
The northern arm is the shorter of the two, maybe 200 metres long and sometimes navigable. At the time of or visit the channel was clear and a boat could penetrate to the end providing the skipper didn't mind reversing out. At other times it is clogged with weed.

 In water - and dry
Beyond this navigable length the line becomes indistinct within a stand of trees, probably occupying a depression now half filled by garden walls. Just as you think you must be on the right line the shape of narrowboats loom above you  and you have stumbled across the far end of Bumblehole.

Wednesday, 20 October 2010

Government Spending Review and British Waterways

I see trouble ahead - and it ain't moonligh and music

The long awaited Government spending review is upon us and it looks like we are all in for some tough times, paticularly public sector employees. Not that I am shedding any tears as my personal experience of Government, particularly that of the local variety, is one of astonishing incompetence and waste.

But what does this mean for British Waterways? Love them or loath them, they are the body responsible for keeping our lovely playground ticking over, so what's bad for them is also probably bad for us.

Well, BW falls within the Department for the Environment, Farming and Rural Affairs (DEFRA) and they have been savaged, mullered or generally duffed up I am afraid.

DEFRA's budget has been cut by 29% by 2014/15 - reducing from £2.9bn to 2.2bn.

Sure DEFRA do a lot more than British Waterways but we can reasonably expect BW to be in the firing line for some serious pain. Back office savings  won't do the trick so expect less of those friendly boys and girls in their blue sweatshirts and less help in remote locations.

The good news (or at least I think it is good news) is that the Review  also confirms DEFRA's plans to move BW into a new Waterways Charity. I know that this comes with uncertainty but its got to be a good thing in the long run.

I would love to be part of the planning process for the new Waterways Conservancy. There are so many ways to make more of our unique resource, and a lot of those would raise serious dosh.

If you want to see the details for yourself here is the link. You will be looking for page 60.

Windmill End, Netherton

Windmill End, Netherton
BCN
20th October 2010

After a weekend of flu and aches I was itching to get outside in the fresh air, and where better to go than Netherton? An obvious location I would have thought.


My favourite view of Cobbs Engine House

Yes, that's right. With the 2010 cruising season coming to a close Captain Ahab and Able Seaman Jeff have returned to their quest of seeking out the abandoned nooks and crannies of the BCN, the more obscure the better.

Majestic ruins

Windmill End isn't exactly abandoned from a boating perspective but there is precious left of the intensive industry which occupied the area for 150 years. Standing tall above this post industrial wasteland stands the skeletal remains of Cobbs Engine House, or Windmill End Pumping Station to give it its proper name.


This gaunt structure was built in 1831 on three stories to contain a Newcomen type beam engine which faithfully pumped 1.6m litres of water per day from Windmill End Colliery 525 feet below for nearly 100 years. By 1928 the coal seams were no more and the obsolete engine was moved to a Michigan museum.

Slag heap cresta run

Whilst the boilerhouse may be roofless, it is a listed structure standing slightly apart from the 11"6' square tapered chimney which rises 95 feet into the sky, serving as a landmark for miles around.

Warrens Hall Colliery Basin - flattery to deceive

We walked around this impressive ruin, viewing it from all angles. Perhaps the best perspective is from the top of the windswept slag heap which is all that remains of Windmill End Colliery, its steep slides sweeping down to the polluted depths of Warrens Hall Colliery Basin.

The Sandwell Council gives this site the 9th place in their top ten waterways attraction, and what is number one I hear you cry? Answer: The Engine Arm Aqueduct - and they are not wrong!